top of page

PO4501624133
Provision Of Tools, Equipment And Manpower To Supply, Deliver, Install And T&C Of FC (380v) At Midfield Apron At HKIA
CLPe Solutions awarded RAAL the contract: PO4501624133 for the Supply and Replacement of Fixed Ground Power Systems (FGP) or 400Hz Frequency Converters (FC) at the Hong Kong International Airport (HKIA). The units were we delivered, installed, tested, and commissioned at the Midfield Apron. The installation of the FC provides reliable and stable power to aircraft for servicing and maintenance, ensuring timely and precise arrivals and departures turn around of flights.




PROJECT
EXPERIENCE
bottom of page