top of page
IMG_9595_edited.jpg

PO4501624133

Provision Of Tools, Equipment And Manpower To Supply, Deliver, Install And T&C Of FC (380v) At Midfield Apron At HKIA

CLPe Solutions awarded RAAL the contract: PO4501624133 for the Supply and Replacement of Fixed Ground Power Systems (FGP) or 400Hz Frequency Converters (FC) at the Hong Kong International Airport (HKIA). The units were we delivered, installed, tested, and commissioned at the Midfield Apron. The installation of the FC provides reliable and stable power to aircraft for servicing and maintenance, ensuring timely and precise arrivals and departures turn around of flights.

PO4501624133_01_edited.jpg
PO4501624133_01_edited.jpg
PO4501624133_02_edited.jpg
PO4501624133_02_edited.jpg

PROJECT
EXPERIENCE

bottom of page