top of page

PROJECT
EXPERIENCES

WhatsApp Image 2022-12-22 at 07.21_edited.jpg

CONTRACT T21W013*
Replacement of Airfield Ground Lighting (AGL) Light Fitting and Constant Current Regulator (CCR) at Centre Runway and Taxiways at Hong Kong International Airport

T21W011-2.jpg

CONTRACT T21W011*
Replacement of Frequency Converters & Connecting Units (Pit) of Fixed Ground Power System in Cargo Apron at Hong Kong International Airport

IMG_3859.JPG

CONTRACT 1380EM21M*
Supply and Installation of Obstacle Light System at Castle Peak RTHK Transmission Station at 800M above sea level

Chinney-Doc. No. 252600830

Doc. No. 252600830

Chinney Alliance Engineering Limited - Autonomous Tracker Charging Station's Strengthening Enclosures Works.

CX_PO4500248061-10_edited.jpg

PO4500248061
Cathay Pacific - Service Training Mock-up: Electrical inspection and Testing of Cathay GPU - powered Simulator Cabins and Training Centres and EMSD Form WR1 & WR2A Issuance.

WhatsApp GIF 2025-06-18 at 07.30.43.gif

PO4200494314
Inspection and OEM analysis reporting of frangible approach light masts at Hong Kong International Airport (HKIA) south runway

IMG_0781_edited.jpg

CONTRACT C3408
Third Runway Concourse And Apron Works - Fixed Ground Power (FGP) And Pre-Conditioned Air (PCA) Works

IMG_9595_edited.jpg

​PO4501624133
Provision Of Tools, Equipment And Manpower To Supply, Deliver, Install And T&C Of FC (380v) At Midfield Apron And HKIA

03 RFT24000018-2_edited.png

RFT24000018
Modernization Of 400hz Fixed Ground Power System Hanger 1 Phase 2 For HAECO

04 C3733-01_edited.jpg

CONTRACT C3733
Permanent Power Supply System Of Existing Underground HKO Equipment Room - Provision Of Transformer, Electrical Works For OF & Are Store And HKO Pillar Box

05 C3310-8_edited_edited_edited_edited.jpg

CONTRACT 3310
North Runway Modification Works 

PHOTO-2025-03-11-16-00-03_edited.jpg

CATHAY PACIFIC TRAINING CENTER
Ground Power Units (GPU) Installation And Maintenance

SMR Tower2_edited_edited.jpg

CH321561*
Surface Movement Radar (SMR) Works for Civil Aviation Department

PO20008956S(N) Bay L & N.jpg

PO20008956S(N)*
Upgrade Of Entire H3A 400HZ Ground Power Unit System

C3206_02.JPG

C3206* - CHEC305/SC1275
Three Runway System - Main Reclamation Works

3052EM20M.jpg

3052EM20M*
Improvement Work of Airfield Ground Lighting (AGL) Transformer Housings and Associated Accessories at Hong Kong International Airport 

C3402a.jpg

CONTRACT 3402*
PMI 034 Taxiway A&B Advance Works for C3310 North Runway Modification Works

ITWGSE FA.png

PA11305*
Framework Agreement for The Supply of Spare Parts for Fixed Ground Power System (AXA Equipment) at The Hong Kong International Airport

T20W002A_edited.jpg
T19W001.jpg
T20W021-1.jpg

CONTRACT T20W002*
Replacement of Frequency Converters and Connecting Units of Fixed Ground Power System at The Hong Kong International Airport

CONTRACT T19W001*
Replacement and Enhancement of Movement Area Guidance Signs on Runways at HKIA

CONTRACT T20W021*
Design, Supply and Installation, T19M405 - Maintenance Service of Unmanned Aircraft System Detection and Interception System (UASDIS)

T2017-044a_heic.png.avif

T2017-0044*
Design, Supply and Upgrade of Fixed Ground Power Systems (FGP) at HAECO Hangar 1

P568 EVWL1.jpg

CONTRACT P568*
Midfield Apron Development Works - AGL, AWOS Mast, EVWL, APA and AGLCMS.

Gan airports 3_edited.jpg

GAN INTERNATIONAL AIRPORT*
Design and Supply of Constants Current Regulators (CCR). (Maldives)

NOTE:- * Projects that was completed by the director of RAAL under his previous companies.

bottom of page